Yongyang contains other products and information you need, so please check it out.
Before purchasing an overhead crane, there are many factors to consider in order to purchase the ideal overhead crane. Your purchase is usually for a facility that increases productivity and safety. So you really need to consider a few things before buying an overhead crane, not only will it save you money, you will be investing in the best overhead crane for your application.
The application of your overhead crane will determine which type and model of overhead craneis suitable for your application.
The weight of the load you want to lift will determine the maximum lifting capacity of the crane model you can choose from.
The span or width of the overhead crane system is critical in determining the size of the crane required.
Make sure the overhead crane will be the right size for loading and unloading materials.
How many hours does the crane work per day and how many times per hour? Determine the working level of your overhead crane.Depending on this duty cycle, different components will be used to make your customized bridge crane. Electric motors have duty cycles and you want to make sure that your bridge crane has the right motor for the job. Picking a severe duty motor for a light duty application will just cause you to spend well over what is required for the application.
Name
Customer Company
Address
Lifting material
Temperature
Highest temperature
_______
Lowest temperature
_______
Environment
Inflammable
YES
NO
Explosive
YES
NO
A - Span(m)
B - Main hook lifting height(m)
C - Auxiliary hook lifting height(m)
D - Floor to rail top(m)
E - Rail top to lowest point of workshop(m)
F - Railway length(m)
Are you interested in learning more about Crane Rail? Contact us today to secure an expert consultation!
SPECIFICATION
Option
Beam Configuration
A. Single Beam B. Double Beam
Capacity(ton)
Main hook
Auxiliary hook
Speed(m/min)
Main hook
A. Single ____ B. Double ____ /____ C. Inverter Control ____--____
Auxiliary hook
A. Single ____ B. Double ____ /____ C. Inverter Control ____--____
Cross travel
A. Single ____ B. Inverter Control ___--____
Long travel
A. Single ____ B. Inverter Control ____--____
Working Class
Main hook
A. M3 B. M4 C. M5 D. M6 E. M7 F. M8
Auxiliary hook
A. M3 B. M4 C. M5 D. M6 E. M7 F. M8
Cross travel
A. M3 B. M4 C. M5 D. M6 E. M7 F. M8
Long travel
A. M3 B. M4 C. M5 D. M6 E. M7 F. M8
Industrial Voltage
____V ___Hz 3phases
Control Mode
A. Remote Control B. Pendent Line Button Control C. Cabin Control
Hook Attached Accessary
A. C-hook B. Grab Bucket C. Magnet
D. Magnet spreader E. Ladle D. Other____
Sinoko cranes is a modern manufacturing enterprise for European standard cranes.The company keeps focus on the cutting edge technology and developments of European style cranes. Based on the technique of European standard cranes , Sinoko products have advantages of low headroom, light weight, excellent free maintenance performance, continuing working efficiency, advanced configuration, galvanized steel rope, disc brake for lifting safety, hardened reducer, PLC lifting limit switch etc. they are innovative products in China crane industry.
Sinoko bridge crane can build top running cranes, under running cranes, double girder cranes, single girder cranes to customize according to the customer's industry conditions. Get free quote.
When looking to buy tower cranes, there is a lot to consider besides the crane brand. For the most part, the tower crane parts play an essential factor in hooking in buyers.
Here are some of the tower crane parts to factor in when deciding which crane to buy.
The boom of a crane is the long arm that moves the load. Booms can either be one solid piece or fold to extend and offer the crane better reach.
The height and radius of the farthest load pick-up will determine how long your tower cranes jib will be. If the construction is vertical, you will need a lift with a longer jib length. In calculating the required length, consider fixed obstructions on or near the job site, such as high power lines, buildings, and bridges.
Its best to check the hoist power capacity. Be sure the hoist has enough power to pick up the heaviest load at the greatest building height.
The hoist of a crane holds, raises, and lowers the load using wire rope or chains, creating the lifts. Hoists can be hand-powered, electrically powered, or powered with compressed air. Choosing a suitable hoist is essential to have a system that will meet your lifting needs.
The hook that connects to the hoist supports the cranes load. Its worth noting how powerful and fast the hook line of your tower crane is for work efficiency.
In doing so, always consider the hoist speed of a standard lift and the weight of a typical load. High line speeds are significant with tall buildings and useless on buildings with five floors and below.
Various parts of a crane use hydraulic pressure function and lift weighted loads around. Most cranes use a hydraulic pump system that uses two rotating gears to pressurize oil. In a gear pump, you will have to run the engine at full power to get high pressure.
Its worth noting that piston pumps are among the most efficient hydraulic pump and is a good basis when choosing your tower crane.
An important tower crane part is the controls which are either mounted, battery-powered, or a hanging pendant. The controls run the drive and hoist motors to control the hoist and the speed. Remote pendants retrofit most crane systems, and so remote operation is a safer alternative in many situations.
These are only some of the basic things you will have to consider when buying a tower crane. Why stop here when you can keep learning about tower cranes.
Dont know where to find more information on tower crane parts? Dont worry; we`re here for you. Contact us and let us know how we can help you!
For more information, please visit Railroad Track Parts for Sale.