For more information, please visit Crane Rail for Sale.
What are the main types of cranes rails ? In general, there are special rails, rail tracks, square rails, and P-type tracks. The special rails are used for particular needs and application.
Crane rail and crane tracks also can be divided into heavy rail and light rail, and the rail size with a nominal weight per meter length.
For your better understanding, the following crane rail drawings and dimension sizes are presented for your reference. For more details information, please feel free to contact us by : + 151 .
Crane rail used for cranes and trolley are with special cross-section and the standard length of crane rails can be grouped into 8 types including 9,915,10,,11,,12, . The general specifications and parameters are presented for your reference. Any need or doubt, please feel free to contact us.
Model
Top
Bottom
Height
Rail top effective width
Weight/m
Standard
Materials
50x30
50
50
30
38
11.8
KOS-Standard
FE52C
60x40
60
60
40
48
19.1
KOS-Standard
FE52C
70x40
70
70
40
58
22.2
KOS-Standard
FE52C
80x60
80
80
60
68
38.6
KOS-Standard
FE52C
100x60
100
100
60
88
47.1
KOS-Standard
FE52C
120x80
120
120
80
108
75.4
KOS-Standard
FE52C
P18
40
80
90
28.2
18.06
YB222-63
55Q
P24
51
92
107
26.13
24.95
YB222-63
55Q
P22
50.8
93.66
93.66
34.92
22.3
GB-89
55Q
P30
60.33
107.95
107.95
44.45
30.1
GB-89
55Q
P38
68
114
134
43.9
38.73
GB183-63
U71Mn
P43
70
114
140
46
44.65
GB182-63
U71Mn
P50
70
132
152
46
51.51
GB181-63
U71Mn
QU70
70
120
120
58
52.8
GB-82
U71Mn
QU80
80
130
130
If you are looking for more details, kindly visit Heavy Steel Rail Manufacturer.
64
63.69
GB-82
U71Mn
QU100
100
150
150
84
88.96
GB-82
U71Mn
QU120
120
170
170
104
118.1
GB-82
Section Square
23.07 cm4
Weight
18.06kg/m
barycenter
X1=4.29cm, X2=4.71cm
Inertia Moment
Ix=240cm4;
Iy=41.1cm4
Section Square
31.24 cm4
Weight
24.95kg/m
barycenter
X1=5.305cm, X2=5.395cm
Inertia Moment
Ix=486cm4;
Iy=80.46cm4
Section Square
49.5 cm4
Weight
38.733kg/m
barycenter
X1=6.67cm, X2=6.67cm
Inertia Moment
Ix=cm4;
Iy=209.3cm4
Section Square
57cm4
Weight
44.653kg/m
barycenter
X1=6.85cm, X2=7.15cm
Inertia Moment
Ix=cm4;
Iy=260cm4
Section Square
67.3cm4
Weight
52.8kg/m
barycenter
y1=5.93cm, y2=6.07cm
Inertia Moment
Ix=.99cm4;
Iy=327.16cm4
Section Square
81.13cm4
Weight
63.69kg/m
barycenter
y1=6.43cm, y2=6.57cm
Inertia Moment
Ix=.4cm4;
Iy=482.39cm4
Section Square
113.32cm4
Weight
88.96kg/m
barycenter
y1=7.6cm, y2=7.407cm
Inertia Moment
Ix=.73cm4;
Iy=940.98cm4
Section Square
150.44cm4
Weight
118.10kg/m
barycenter
y1=8.43cm, y2=8.57cm
Inertia Moment
Ix=.79cm4;
Iy=.83cm4
Note:
The crane rail is typically made of U71Mn steel. Q275 square steel or flat steel is the most common type of square steel.
In recent years, low-alloy structural steels such as Mn, Si, and P alloy elements have been used to improve the wear resistance and corrosion resistance of steel rails. Different types of crane rails are chosen based on the design and application of overhead rail cranes and gantry rail cranes.
Crane rail certificates
Crane rail certificates
ISO crane rail certificates
ISO crane rail certificates
Crane rail clamps and press plate for overhead crane. All types of cranes and crane accessories are available from us. Our crane rail, crane rail clamps and press plate for sale at good price. Check the overhead crane rail accessories now.
Pressing plates for fastening of the crane rails / crane tracks
Bolted platens
overhead crane rails with Bolted platens
Pressing plates parts
Pressing plates
Bolted platens
Welded platens
Overhead crane with Welded platens
Clamp plates of crane rails and tracks
Crane rail clamp plate with bolts to connect the two rails
Crane rail clamp plate
Press plate and Clamp plate for light type rail as P24,P30
1. Crane rail joint seam is typically 1 to 2 mm, but it is recommended to use 4 to 6 mm when installed in cold climates or when the temperature is lower than the perpetual usage temperature and differs by more than 20 °C.
2. A crane rail can be joined with a straight head, a 45 degree bevel joint, or an inclined junction that creates a smooth transition connection for the wheel.
3. The height difference and dislocation of the two rails must be smaller than 1 mm.
4. Setting up for welding. Carefully remove any oil contamination and rust, from the groove and the surrounding area before welding the crane rail joint.
5. The welded rail connection sequence is from bottom to top, following the first rail waist rail, rail head, one by one step by step a way for surfacing, and then around the last repair.
6. The issues that need to be resolved during the welding of crane rails.
When welding in each layer when the wave, especially in the welds crane rail bottom of each layer of welding wave, use one finish electrode welding, avoid or move between electrode and arc breaking, 2 layer before and after welding the welds should be the opposite direction of the wave;
Each crane rail joint welding job must be done continuously to keep the end of the rail welding at high temperatures (300 °C 350 °C). After welding, if the eliminating stress prior to heat treatment has not been cooled after heat treatment, rain must be avoided; heat the copper plate can be removed with water cooling, in order to use the next time.
7. Rail connection smooth processing
Crane rail welding joint eliminates stress after heat treatment and cooling to atmospheric temperature, resulting in smooth processing of the track on the top and sides of the weld. When the welding bulge is too large, it will be polished with a grinding wheel polishing machine until flush with the rail head, and then surface ground.
How to select the right crane rail for your rail travelling overhead crane and gantry crane? Theoretically, the selection of the crane rails are based on a the various factors, including the types of your rail cranes, crane capacity, travelling speed, working duty, crane application environment and rail foundation, etc. For easy understanding, the following table is presented for your reference. Attentions, if you need to select a type of crane rail for your rail cranes, please consults with professional crane engineer or your crane manufacturer or supplier. Any need, please feel free to contact us.
Note:
The crane rail is paved on supporting beams for overhead cranes, which include steel beams and concrete beams.
Set the position and altitude according to the overhead crane drawing. Before installing rail, inspect the crane rail's groove, section, straight line, and warp. Once qualified, pave the crane rail. Also, determine the rail datum line.
If the crane rail is laid on a supporting beam, the deviation between the crane rail center distance and the supporting beam center distance should be less than 10mm and no greater than the beam half thickness.
Pressure plate welded on the steel bearing beam
Bolted on the steel bearing beam
Crane rail is attached to a supporting beam, and the rail bottom should be solely laying on the beam top. If there is space and the length is greater than 200mm, it should be padded; the pad length should be greater than 100mm, and the width should be 1020mm wider than the rail bottom. Each pad set must have no more than three layers. Pads are welded to the underlying beam.
For general use rail gantry cranes, the deviation between cane rail center distance and installing datum line should be no more than 5mm.
Following is formula:
S=±[3+0.25(S10)] : S: crane span deviationmm Srail center distance deviationm
The crane rail connecting joint should be stagger, the staggered distance is not same as wheel gauge. And on joint, the supporting point should be at span's 1/31/4. Crane rail i-beam flange weld bevel butt weld, web has same strength through welding butt weld, after welding, the welding surface is leveling. Artifacts correction for the inclination of the I beam flange delta < / 80 b, b is I beam flange width. Torsion of Angle steel, i-beam vector hL/ or less, but shall not be bigger than 5 mm. Local buckling of steel plate rise within a certain range f1.5mm.
If a steel plate is crooked, you can fix it with a hammer. There is a particular Jack to do gagging for some structural steel. Heat straightening is an option if it's challenging, but the heat temperature shouldn't be more than 900°C.
The crane rail's end that will be connected by clamps will then have holes made for bolts. You should make holes by mechanical not instead of gas cutting. Bolts cannot be ragged, cracked, or nicked.
Finally, lay the crane rail and fasten it to the supporting beam with bolts or welding. Ultrasonic testing is used to grade the welding.
If the crane rail is built on a concrete beam, a steel plate should be embedded on top of the concrete beam. Crane rail is fixed by an embedded steel plate, similar to gantry crane rail foundation. Other tasks are similar to those listed above.
Concrete craen rail bearing beam
Concrete foundation of the rail bearing beam
When rail travelling gantry cranes are used in a factory, warehouse, or yard, the crane rail is usually sunken in a groove. Gantry crane rail is prominent on the ground for some large working spaces, such as a port or dock. Whatever the condition, there should be a foundation beneath the gantry crane rail to ensure that the ground can bear the gantry cane and wheel Max. loading pressure.
The safety base of gantry crane operation is a solid foundation for gantry crane.
p38 crane rail foundation drawing
Rail inspect and repair for your rail travelling overhead crane and gantry crane is required to ensure crane safety. The following repair tip is appropriate for your rail travelling crane.
1,Remove Existing Crane rails:
Loosen the bolts and nuts for reserve, or gas cut the platens; these platens will be wasted. Hoisting down the crane rail to the ground.
2,Inspect supporting beam:
3,Verify whether the top of the crane rail has less tread or has undergone distortion from friction. And check to see if the crane rail is still straight.
Correctly pave the crane rail and operate your gantry and overhead cranes in a secure manner. For further details about crane rail type, requirements, installation, inspection, and maintenance, please feel free to get in touch with us.